Chandler Corporate Center Phase I - Tempe, Ariz.
Client: Layton Construction
Location: Chandler, AZ
Project Info: Construction of a 121,389 SF concrete, tilt-up two-story with composite beam 2nd floor and open web joist roof. The building has a main entry element with a two-story open lobby with a feature stair taking visitors up to the second floor. The building will have two electrical rooms and two IT rooms per floor and a single fire riser room.
Completed: 2018