Construction of new 136,650 Square foot new Veterans Hospital that will house 120 occupants. This project was Design Build with an 18 month schedule from design to completion.
Design Build of new 238,500 square foot manufacturing facility for Café Valley. The wholesale bakery company will have up dated equipment and have room for distribution and cold storage.
Construction of a 10 story 236,600 square foot mixed-use building including apartments, retail and parking near the ASU campus.
Client: Broad Rack Structures
Location: Haslet, Texas
Project Info: 250,500 Square Feet
Completed: 1998
Design Build upgrade to existing warehouse, removed existing sprinkler system and installed new ESFR system to 116,850 square foot building and performed rework to existing office for new tenant.
Construction of a new 534,470 square foot 9 story Class A office building with 3 levels of below grade parking. This project consists of wet pipe systems, standpipes and a pre-action system.
This project consisted of removing the existing sprinkler systems and replacing it with new ESFR systems adding a 1250 gpm fire pump and rework to the existing offices for new Tenant layout. This was a Design Build retrofit totaling 157,664 square feet.
Design Build LEED project 71,223 square foot new Material Recovery Facility fire protection system installed according to FM Global, Pump in a Box diesel fire pump, and water storage tank.
Design Build of a 31,828 square foot freezer expansion for Valley Cold Storage. Project included double interlock pre-action dry pipe sprinkler system at the roof and within the racks. The system was designed to protect class II commodities.
Design Build new warehouse/office distribution center for Home Depot, installation of a ESFR system to 534,914 square foot building.
21605 N. Central Ave.
Phoenix, AZ 85024
170 N Maple Street, Ste 112
Corona, CA 92880
5580 Havana Street, Suite 4A
Denver, CO 80239
21605 N. Central Ave.
Phoenix, AZ 85024
6753 E. 47th Avenue Drive, Units F & G
Denver, CO 80216